    Curraghderrig is a 6-acre wind-farm, near Asdee, in north Co. Kerry. It has 2 turbines with an export capacity of 4.6 MW. The turbine type is E-70/E4 2.3MW with a hub height of 64m. Enercon was the turbine manufacturer and distance to the grid is 2.6km approx. The wind-farm was energised in December 2017. Rengen Power’s role was throughout and included the appointment of design and construction teams, negotiation of turbine supply/EPC contracts, land lease agreement, land access and wayleave agreements, all regulatory and statutory compliance, acceptance of PPA offer and signing of contracts, financial close, wind farm construction and commissioning.